In order to facilitate the masses of customers, second hand engineering machinery trade limited company of the northwest of Xi'an undertakes lease business of different project equipment, the major project equipment leased has: Excavator , loader, bull-dozer , road roller , crane , tower car , paver , mixer , mill person who plane,, stability soil is it stand to mix, pitch mix stand , concrete pump ,etc. of towing etc..

Lease detailed rules and regulations in machinery :

1.Both sides negotiate and confirm that leases the way and detailed content through the commercial affair, sign the contract.

2.The ownership of the machinery equipment belongs to second hand engineering machinery trade limited company of the northwest of Xi'an while leasing, can't transfer , sublet , sells off the equipment or mortgages to others while leasing the side.

3.The rent adopts the way to use after paying the bill and settles account. Lease when the person who pull into and then pay pieces of rent per month , prepay next month all rent one day ahead of time every month while being back. Otherwise, the personnel of our department have the right to shut down.

4.Fail to pay the rent on schedule , our department has the right to terminate the contract and regain the equipment unconditionally, or and then while postponing paying the rent, our department has the right to regard rent not paid the base figure on schedule as according to 9¡ë overdue interest of day as leasing.

5.The continuous working time of every day of mechanical equipment can't generally exceed 10 hours .

6.Working time is with 8 hours of every day, 26 days of every month are calculated, monthly working time is subject to 208 hours, if work per month and go beyond for 208 hours, then the rent increases hard according to 200 yuan per hour, fewer than in the moon 208 hours, must calculate according to the rent per month .

7.The expenses that machinery pulls into the building site are leased and then undertake, haul out the expenses of building site are undertaken by our department.

8.The equipment is leased with the diesel oil is it bear to responsible for when leasing, our department ensured mechanical performance to be intact ago stocking the building site, and is it hand over single to fill in, I department responsible for machinery change easy to decrease the fittings and force maintenance during using, leasing the side should give assistance , if cause and delay work , is refilled in time by our department.

9.If equipment presents losing , damaging or equipment in conceal my department cases to others, lease and then is it compensate for to responsible for , and bear losses caused to our department.

10.When being full, the equipment withdraws from the arena , leasing the side should facilitate our department in rental period, help me to be department smooth to appear on the scene the equipment.

¡¡¡¡Tel£º029-84360088¡¡84360611¡¡84360633
¡¡¡¡Fax£º029-84360188
¡¡¡¡Mb£º13892858539
¡¡¡¡Email£ºxb2shou@xb2shou.com
¡¡¡¡Contact£ºMr.Fu